EnFloTech has the expertise to design, fabricate, and install transfer chutes and hoppers for bulk handling of materials. The company was awarded the design, manufacture, and installation of coal transfer chutes at both Arnot and Hendrina Power Stations. Following these projects, EnFloTech developed in-house capabilities to design chutes using proven coal specification analysis and Discrete Element Modelling (DEM) verification.
Comprehensive Bulk Handling Design Solutions
A comprehensive design of coal transfer systems is conducted, encompassing everything from material testing and 3D modelling to flow calculations and DEM verification, culminating in the development of detailed manufacturing drawings.